Find an architect

55 WA

Kingston upon Thames

Project Details

£0.5m to £0.99M

Within a Conservation Area, Alteration to existing property

Practice

WR-AP

No. 15 Teddington Business Park , Station Road , TEDDINGTON , Middlesex , TW11 9BQ

55WA is a remodelling of a family home in Kingston. The client’s brief was to design a sustainable home through the improvement of internal living spaces, with the addition of a rear and side extension, loft conversion and roof terrace. The sites generous plot lent itself to optimising the buildings potential and we worked hard to achieve this whilst conforming to strict local planning policy. The resulting design enjoys a sensitive street frontage with a more distinctive and contemporary addition to the rear, designed to complement the existing building. The design also includes a number of sustainable measures, from biodiverse roofs, to carefully considered orientation, to the integration of an air source heat pump, to ensure the building not only looks aesthetically pleasing but is comfortable to live in and efficient to run too. Planning permission was granted in June 2022, with construction expected to commence in the Autumn of 2022, with completion the summer of 2023.