Log in to access exclusive content, membership benefits and update your details. You can find your RIBA Membership number on your membership card.
Not a member? Join the RIBA
Don't have a login? Create a web account
£250,000 to £499,999
Alteration to existing property
Unit C/2, Bussey Building , 133 Copeland Road , LONDON , SE15 3SN , United Kingdom
Extensive external and internal refurbishment of the existing Peacock Theatre in Holborn. The project involved the renovation of the external frontage of the building, and a full interior refurbishment, all designed to accommodate the theatre’s various functional requirements, from Sadler’s Wells’ theatre productions, to LSE’s lectures, events, and graduation ceremonies. The refurbishment work had to be fitted around the theatre’s busy schedule which only allowed for a 3 week window each year for all works to take place, so the project has been phased over a 3-4 year period. The external works included a new fascia to the existing canopy incorporating new signage with integrated lighting, and a grid of theatre lights that were installed to the underside running from inside to out, creating a more dramatic sense of arrival. The existing timber doors and panelling were stained black and all of the ironmongery was replaced with new brass fittings. Associated advertising panels were upgraded, and existing external walls painted black to bring all of the previously disjointed elements together. The internal works comprised of new floor and wall finishes throughout, new lighting, and custom designed furniture. A new reception desk, merchandise display counter and seating niche were created. A new light installation, featuring pendant lights designed by Feix&Merlin, was installed. The pendants form part of the Feix&Merlin product range that the studio has been developing. A new carpet was fitted throughout, featuring a graphic down the centre creating a runner from the entrance up to the reception desk, and brass nosings on the stairs. Balustrades were refurbished with new finishes, and existing elements like the geometric brass balustrades were made good and polished up celebrating the theatre’s original features.